ACPBALL DIABLO WRATH  AND WRATH LTD 26 GRAM RAM INSTALLATION AND TUNING INSTRUCTIONS.

 

1.   REMOVE BOLT AND PIN.

2.   REMOVE HOSE FROM RAM CAP.

3.   REMOVE RAM CAP, RAM, AND RETURN SPRING.

4.   INSTALL RETURN SPRING ONTO NEW RAM, LUBE RAM AND INSERT INTO RAM CAP. INSTALL ASSEMBLY INTO MARKER BODY AND RECONNECT RAM CAP HOSE.

5.   REINSTALL BOLT AND PIN.

6.   BEFORE PRESSURISING BACK OUT BOTH HIGH AND LOW PRESSURE REGULATOR ADJUSTER SCREWS UNTIL EACH SCREW IS FLUSH WITH THE END OF EACH REGULATOR BODY. ADJUST THE LOW PRESSURE REGULATOR SCREW IN 2 AND A HALF TURNS.

7.   ATTATCH AIR TO MARKER, ADJUST THE HIGH PRESSURE REGULATOR TO 250-275 P.S.I. GAUGE READING. FINAL VELOCITY CONTROL MUST BE PERFORMED USING A CHRONOGRAPH. USE THE HIGH PRESSURE REGULATOR TO ACHIEVE THE FIELD LEGAL F.P.S.